OST UPS Central Kalimantan, Indonesia won the bid for coal-fired power plants 2X66MW UPS project


OST UPS Central Kalimantan, Indonesia won the bid for coal-fired power plants 2X66MW UPS project 

 

In Central Kalimantan, Indonesia 2X66MW coal-fired power project tender UPS Division I once again demonstrated the great advantage of the power of the UPS, after several months, defeating the ultimate success of many internationally renowned manufacturers, winning 13 sets exclusive power UPS (15-60KVA). 

 

This is the OST power UPS products in the domestic market once again successfully. After several successful, OST UPS power firmly occupy the leading position in the domestic market, the manufacturing industry.


Copyright by ostpower.com.cn, without written authorization and permission, it shall not be used for any commercial purpose, otherwise it will be investigated for legal responsibility!